Skip to main content

RUiXU 48V 5120Wh Server Rack Battery / Schneider Inverter Communication

Posted by Jonathan Mccrary on Sep 16th 2024

Connect Communication Cable

  • Communication Cable

Use a standard RJ45/ T568B color code/ CAT5e Ethernet Cable(The maximum length is not more than 10 meters) Cut off one end of the T568B standard network cable and reconnect the RJ45 plug according to the following sequence in the diagram. The newly connected RJ45 plug is connected to CCGX. The original end is connected to the battery pack BMS.

 

 
  • Connect

Connect the master battery C-up port to the Conext Gateway.

 
 
 
 

 
 
 
 
 

Battery setting (Inverter Protocol chosen by ADD)

  • Master battery

 

  • Slave battery

 
 
 
 

Inverter setting

Please refer to the following document: Click to view the document