Connect Communication Cable
-
Communication Cable
Use a standard RJ45/ T568B color code/ CAT5e Ethernet Cable(The maximum length is not more than 10 meters) Cut off one end of the T568B standard network cable and reconnect the RJ45 plug according to the following sequence in the diagram. The newly connected RJ45 plug is connected to CCGX. The original end is connected to the battery pack BMS.
-
Connect
Connect the master battery C-up port to the VE.Can of Victron Colour-Control-GX.
Battery setting (Inverter Protocol chosen by ADD)
-
Master battery
-
Slave battery
Inverter setting
Menu>settings>services>CAN-bus Profile, select CAN-bus BMS(500 kbit/s), and Confirm and restart(Menu>settings>general>reboot?).